Blue Glass Wall Partition for Morden Office
Min. Order: | 1 Meters |
---|
Supply Ability: | 20000 |
---|---|
Port: | Shanghai |
Product Description
1. Grade: 6063-T5
2. Size: 1200mm*3000mm
3. ModelNo.: PSNK108
4. Certification:ISO9001,ISO14001,SDS,CCC
Product Name | Soundproof Double glass Office Wall Partition with Built-in Shutter |
Frame Material | 6063-T5 Aluminium Alloy |
Glass Type | Laminated Tempered Glass |
Wall Thickness | 108mm |
Glass Thickness | 5mm/6mm/8mm |
Baseboard Highness | 32mm |
Frame Width | 32mm |
Keel Width | 32mm |
Blind Width | 16mm/25mm |
Keel Material | 6063-T5 Aluminium Alloy |
Size | 1200*3000 (Can be customized) |
Sealant | High strength double sided foam sticky tape,EPDM |
Sound Proof Coefficient | 45dB |
Shock Resistance | More than 5 times |
Painting methods | Anodizing,Powder Coating,Fluorocarbon Coating,etc |
Color&Pattern | Customized |
Service | ODM&OEM |
Certification | ISO9001,ISO14001,SDS,CCC |
Color choice & DIY PatternWe use multiple methods to make every color is possible, and we have professional designer who will help to desgin the pattern. |
Products Show
Our Service
1) Professional manufacturer and exporter with 18 years production and engineering experience;
2) Free CAD design,R&D department welcomes your OEM&ODM projects.
3) Self-developed mold and durable products.
Packaging Details
Export carton box and wood pallet or customized packaging
Delivery Time
Shipped in 20 days after advance payment(T/T 30% deposit advanced,balanced before shipping)
Lead Time :
Quantity(Square Meter) | 1 - 100 | 101 - 500 | 501 - 2000 | >2000 |
Est. Time(days) | 15 | 20 | 30 | To be negotiated |
Step 2: Send detailed project drawings or dimensions to us.
Step 3: We provide the solution and quotation.
Step 4: Negotiation and details discussion.
Step 5: Place order and arrange deposit.
Step 6: Make detailed shop drawing for approval before production.
Step 7: Arrange production after the shop drawing confirmed.
Step 8: Quality control and Inspection.(Production pictures will be provided for checking)
Step 9: Arrange balance
Step 10:Arrange shipping after received the balance.
Step 11:Provide shop drawing for installation
Step 12: After sales
Please contact us if you have any concerns with your order. We are dedicated to 100% satisfaction and we will make sure you are happy with your purchase. We hope you will see that we offer 5-star service.
https://
https://
Product Categories : Office Partition > venetian blind double glass partition